Stream

46 days of work started on the Anatolian Motorway

46 days of work started on the Anatolian Motorway

The Ankara direction of the Anatolian Motorway between Kaynaşlı and Abant is closed to traffic for repairs. Traffic flow in the Ankara direction on the 23-kilometer section between Kaynaşlı and Abant toll booths will be provided via D-100 for 46 days. The Istanbul direction of the highway will be open to traffic.

The 23-kilometer section in the Ankara direction of the Bolu Mountain crossing of the Anatolian Highway was closed for 46 days due to repair works.

Anatolian Motorway

Police and highway teams dispatched to Kaynaşlı and Abant junctions in the morning hours directed traffic to the D-100 highway after ensuring road safety with warning signs and bollards.

The section in question (including Bolu Tunnel) was closed to traffic from 11.00 am until 17.00 pm on November 9 for the extension of the tunnel portals in the direction of Kaynaşlı as steel construction and 5 joint replacements on 3 viaducts.

Anatolian Motorway

On the 23-kilometer section between Kaynaşlı and Abant toll plazas, traffic flow in the Ankara direction will be provided via the D-100 for 46 days, while the Istanbul direction of the highway will be open to traffic.

Gül Demirci

Hi, I'm Gul. I am a writer for Expat Guide Turkey and I strive to create the best content for you. To contact me, you can send an e-mail to info@expatguideturkey.com. Happy reading!

Related Articles

Back to top button

Ad Blocker Detected

We earn income from advertisements in order to provide you with a better service. Please turn off your ad blocker and refresh the page to access the content.