$4 Billion News: 927 Thousand Ounces Yozgat Gold Potential Discovered In Yozgat

Ahlatcı Altın İşletmeleri Announces: Processing Plant Decision Revised For Sarıkaya Project With Approximately 30 Tons Of Gold Potential
YOZGAT, Turkey – A discovery of major significance for the Turkish economy and mining sector has been announced. Ahlatcı Altın İşletmeleri (Ahlatcı Gold Enterprises) reported that they have reached substantial Yozgat Gold Potential as a result of detailed exploration work conducted in the Sarıkaya district of Yozgat. Initial modeling indicates the region holds an estimated 927,000 ounces (approximately 30 tons) of gold potential. This quantity is calculated to be worth $4 billion at current market prices.
📝 Section 1: Technical Data And The Scope Of The Discovery
Enerya Enerji AŞ, a 100% subsidiary of Ahlatcı Altın İşletmeleri, shared the UMREK-2023 Code Exploration Targets Report regarding the Sarıkaya gold mine with the public.
- Potential Ore: The report, prepared by Mitus Proje AŞ, was based on detailed geological studies and data from 56 drillings performed in the field. Calculations estimated approximately 41.2 million tons of potential ore across the 1,968-hectare area.
- Grade Value: The average grade (tenor) of this ore was determined to be 0.70 g/t (0.70 grams per ton), with a specific gravity (SG) value of 2.70 g/cm³.
- Potential Size: This data translates the Sarıkaya Gold Mine Project’s total potential to a value of 927,000 ounces.

💡 Section 2: Revision In Investment Strategy
Ahlatcı Altın İşletmeleri adopted a crucial strategic decision to increase efficiency and speed in its mining investments.
- Plant Decision: The company revised its previous decision to build a new gold processing facility. Instead, the ore will be processed at an existing facility located near the region.
- Financial Advantage: This revision will significantly reduce investment costs. Therefore, the strategy aims for the financial returns and impact of the project to be realized in a shorter period. [INTERNAL LINK: Gold Mining Investments And Legal Status In Turkey]
📅 Section 3: Exploration Target And Future Plans
The report indicates that the current drilling density still keeps the project at the “Exploration Target” level. However, work continues without slowing down.
- Ongoing Work: While work to realize the Yozgat Gold Potential continues, Ahlatcı Altın İşletmeleri announced it will release reports concerning the other 6 licensed mining sites in Yozgat in the near future.
- Expansion Vision: The company stated it will continue evaluating new investment opportunities as part of its growth objectives in the gold mining sector. This situation signals Ahlatcı’s intent to strengthen its position in the mining industry.


